EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH |
CLIENTS
|
CONTRACT VALUE (BTD) |
EQUIVALENT VALUE IN UDS (APPROX.)
|
COMPLETION DATE
|
Name of project: Installation works including testing and commissioning for Construction and expansion of distribution network for Dhaka Power Distribution Company of Lot-1 (North Zone) | Employer/End User: Dhaka Power Distribution Company Limited (DPDC) | 483,699,886 | May-19 | |
Name of project: Installation works including testing and commissioning for Construction and expansion of distribution network for Dhaka Power Distribution Company of Lot—2 (South Z one) | Employer/End User: Dhaka Power Distribution Company Limited (DPDC) |
306,010,972 |
May-19 | |
Supply of Fender, Mooring Bollard and Frontal System for LPG satellite plant at Kolinga, Rupganj, Narayanganj
|
Petromax LPG
|
10,200,000
|
$ 124,390
|
Apr-19
|
Installation of 1000mm dia Raker & Vertical pile with Permanent Full Steel Casing Fix Dolphin Jetty at Karnaphully River, Chittagong
|
Soya Products Bangladesh Ltd, a subsidiary of United Group
|
36,500,000
|
$ 1,402,439
|
Mar-19
|
Installation of Fixed Platform at Barabkunda, Sitakunda
|
BM Energy (BD) Ltd
|
115,000,000
|
$ 1,402,439
|
Mar-19
|
Construction of Civil Foundation, Erection, Testing and Commissioning of 230kV Double Circuit Power Evacuation Line for Summit Gazipur II 300 MW power plant Project, Kodda, Gazipur
|
Summit Gazipur II Power Limited
|
72,593,411
|
$ 885,286
|
Apr-18
|
Construction, Erection, Testing & Commissioning of 132kV Double Circuit Power Evacuation Line for Summit Gazipur 149 MW Power GenerationProject, Kodda, Gazipur
|
Ace Alliance Power Limited
|
32,199,391
|
$ 392,676
|
Apr-18
|
Installation Works including Site Survey & Drawing, Design of Tower Foundation Testing & Commissioning of Chakaria-Matarbari 132kV Single Circuit Transmission Line on Double Circuit Tower
|
Angelique International Ltd, India
|
108,469,400
|
$ 1,322,798
|
Mar-18
|
Stringing of Phase Conductors (Twin Bundle) including OPGW & Earthwire on the line, Length-42 Rt-km under Ashugonj-Bhulta D/C 400kV transmission Line
|
KEC International, India
|
29,261,400
|
$ 356,846
|
Jun-17
|
MPA Vessel Berth Jetty Renovation Works including installation of Fender System at Mongla, Bagerhat
|
Navana CNG Limited (LPG Unit)
|
60,124,181
|
$ 733,222
|
Apr-17
|
Dismantling the 132kV existing line and Fabrication, Erection, Testing and Commissioning of 132 KV double circuit line under Summit Barisal 110 MW Power Plant
|
Summit Power, Bangladesh
|
4,000,000
|
$ 50,000
|
Jan-16
|
Stringing & other associated activities in 132kV Comilla (N) to Comilla (S) T/L under Tripura (India)-Comilla (South) Substation (Bangladesh) Grid Interconnection Project
|
KEC International, India
|
7,920,000
|
$ 99,000
|
Jan-16
|
Water intake construction, sheet piling works, dewatering system & associated works at Ashuganj Power Plant water intake project, Ashuganj, Bangladesh
|
TSK company (Spain)
|
75,962,157
|
$ 949,527
|
Dec-15
|
Strengthening of existing jetty at Mongla cement factory, Mongla, Bagerhat
|
Sena Kallyan Sangstha, under Bangladesh Army
|
107,025,000
|
$ 1,374,233
|
Aug-15
|
Bibiyana Expansion Project, Main Civil Works, Sylhet, Bangladesh. (Cable trenching works, Duct Bank, CPVC Pipe works, HDPE pipe works )
|
Chevron Bangladesh
|
717,770,860
|
$ 8,972,135
|
May-15
|
Design, Supply, Iinstallation, Testing and Commissioning of 132 kV Overhead Transmission Line under “Energy Efficiency Program-II, DPDC, Bangladesh
|
LTB Leitungsbau GmbH, Germany
|
228,100,000
|
$ 2,815,286
|
Apr-15
|
Supply Heavy Equipments for lifting & handling Construction Project
|
Plexal Group, Thailand
|
28,000,000
|
$ 359,897
|
Feb-15
|
Foundation construction, Erection & Stringing of Nine (9) towers for 230 kV Transmission line across Tetulia River (5.5 km) in Barisal under PGCB
|
KEC International, India
|
767,433,116
|
$ 9,864,178
|
Feb-15
|
Bibiyana Expansion Project - PABC (accomodation block), Sylhet, Bangladesh
|
Chevron Bangladesh
|
114,948,751
|
$ 1,478,440
|
Dec-13
|
Bibiyana South Pad Dyke Repair Construction, Contract # 812590
|
Chevron Bangladesh Block Twelve, Ltd.
|
110,286,871
|
$ 1,477,386
|
Jul-11
|
Periodic Road Maintenance Component Contract # 4 for Periodic Maintenance of i) Barobari-Burimary, National Road (N509) 104,630 km under Road Network Improvement & Maintenance Project-I (RNIMP-I)
|
Roads and Highways Department
|
163,683,235
|
$ 2,358,548
|
Aug-10
|
Periodic Road maintenance of Kurigram-UlipurChilmari Road, Contract # PRMC-RZ-7
|
Roads and Highways Department
|
58,368,388
|
$ 845,918
|
Dec-09
|
Design-build and turnkey construction of 132 kV Double Circuit Aminbazar-Savar Transmission Line, length of line 25km, nos. of tower, 80 nos.
|
Power Grid Company of Bangladesh
|
131,683,509
|
$ 1,908,456
|
Jul-09
|
Carrying out Cast-in situ piling (Marine) at Dapdapia Bridge, Barisal
|
MBEC-PBL-COPRI JOINT VENTURE
|
42,740,894
|
$ 623,954
|
Oct-08
|
Road Maintenance and Improvement Project, DhakaChittagong Road, Bangladesh, Milling and cold-in situ Re-cycling and overlay works, (Total 41.38 km) executed by NAZIR-BASIC JV
|
Roads & Highways Department
|
529,058,945
|
$ 8,397,761
|
Jun-07
|
PMP 2005-06/C048 (Bituminous Carpeting work) at Rupsha , khulna&Terokhada, Mollahar
|
Roads & Highways Department
|
15,904,220
|
$ 244,680
|
Dec-06
|
Installation of Test Pilling Work at JattrabariGulistanFlyover.Dhaka, Bangladesh
|
Dhaka City Corporation
|
20,000,000
|
$ 307,692
|
Oct-06
|
Emergency Flood Damage Rehabilitation Project, Contact no.: EFDRP/SZ/HBG/Z-01
|
Roads & Highways Department
|
16,920,436
|
$ 260,314
|
Sep-06
|
Construction of 100 meter Oxbow lake Bridge at Bibiyana Gas field, Sylhet, Bangladesh
|
UNOCAL Bangladesh Ltd.
|
45,000,000
|
$ 692,307
|
Jul-06
|
Strengthening of 2 (two) nos. Bridges at Bibiyana Gas Field, Sylhet, Bangladesh
|
UNOCAL Bangladesh Ltd.
|
13,036,303
|
$ 200,558
|
Jan-06
|
Improvement of 2 nos. LGED Bridge at Enayetgonj Bazar
|
Chevron Bangladesh
|
12,792,000
|
$ 196,800
|
Jan-06
|
Construction of drilling pad for the rig at Chattak East & earth work layer by layer with watering & compaction by roller &vibrocompactor at Chattak East road
|
NIKO RESOURCES (BD) LIMITED
|
48,850,000
|
$ 751,538
|
Jan-06
|
Casing Installation work at Production Pad & Relief Well of Chattak Gas Field, Sunamganj, Sylhet, Bangladesh
|
Niko Resources (Bangladesh) Ltd.
|
7,551,959
|
$ 131,338
|
Nov-05
|
Construction of Foundation, piling work and Erection of Generator room, Shelter room, Guardroom, Boundary wall etc. for Microwave Tower and related works at Sitakunda&Wahedpur, Chittagong, Bangladesh.
|
Orasinvest (BD) Ltd.
|
10,384,369
|
$ 180,597
|
Nov-05
|
Strengthening of existing pavement of SylhetFenchuganj-RajnagarMoulvibazar-Srimongal-Shaistagonj-Teliapara-Jagadishpur Road (With link to Sherpur) under Habiganj Road Division of Sylhet Road Circle, Sylhet during the
year 2004-2005, Contract No. 01 (One)/2004-2005/SE/SRC, Sylhet, Bangladesh
|
Roads & Highways Department
|
107,045,047
|
$ 1,861,653
|
Nov-05
|
Casing installation at Bibiyana North Pad Location, Sylhet, Bangladesh
|
UNOCAL Bangladesh Ltd.
|
5,806,024
|
$ 100,974
|
Oct-05
|
Land Development and Slope Protection work at proposed Khulna 230/132 kV Substation, Batiaghata, Khulna; Contract No. 01/PGCB/ Sec/2004/2550, Khulna, Bangladesh, Land Development work
|
Power Grid Company of Bangladesh Ltd.
|
28,364,466
|
$ 493,295
|
Oct-05
|
Construction of Drilling Pad of Chattak Gas Field, Sunamganj, Sylhet, Bangladesh
|
Niko Resources (Bangladesh) Ltd.
|
18,700,000
|
$ 325,217
|
Sep-05
|
Construction of 3 nos. Bridge at Chhatak East Road, Chhatak Gas Field, Sunamganj. Sylhet, Bangladesh
|
Niko Resources (Bangladesh) Ltd.
|
12,904,860
|
$ 224,432
|
Sep-05
|
Electrical instrumentation and installation work at Lafarge-Surma Cement Plant, Sylhet, Bangladesh
|
Larsen & Toubro Limited, India
|
2,505,403
|
$ 43,572
|
Aug-05
|
Periodic Maintenance Program 2003-PMP-2/2003-2004, Package No. PMP 2003-2004/C49 under Roads and Highways Department, Barisal, Bangladesh
|
Roads & Highways Department
|
22,643,855
|
$ 393,806
|
May-05
|
Construction of Barapukuria-Rangpur 132 KV Double Circuit Transmission Line
|
HG Power Transmission SdnBhd, Malaysia
|
30,564,000
|
$ 531,547
|
Mar-05
|
Strengthening of existing pavement of MoulvibazarSrimongal-Shaistagonj-Teliapara-Jagadishpur Road (With link to Sherpur) under Moulvibazar Road Division of Sylhet Road Circle, Sylhet during the year 20032004, Contract
No. 02 (Two)/2003-2004. SE/SRC, Sylhet, Bangladesh
|
Roads & Highways Department
|
196,130,796
|
$ 3,410,970
|
Mar-05
|
Strengthening of existing pavement of Moulvibazar-Sreemongal, Sylhet during the year 2003-2004, Contract No. 03 (Three)/2003-2004. SE/SRC, Sylhet, Bangladesh
|
Roads & Highways Department
|
167,098,115
|
$ 2,906,054
|
Feb-05
|
Piling work at Lafarge-Surma Cement Project, Sylhet, Bangladesh, Construction of cast-in situ bored piling work with Rotary Rig, 1200mm, 1000mm, 800mm and 600mmdia
|
Larsen & Toubro Limited, India
|
89,288,628
|
$ 1,566,467
|
Dec-04
|
Construction of Foundation and Erection of Microwave Tower and related works, Magura, Bangladesh, Castin-situ bored piling of dia600mm, construction of foundation, erection of tower
|
Pacific Bangladesh Telecom Ltd.
|
31,070,946
|
$ 545,104
|
Oct-04
|
Carrying out Bored cast-in-situ pilling work with Rotary Rig at Lafarge Surma Cement Plant Project, Chatak, Sylhet
|
Larsen & Toubro Limited, India
|
113,226,897
|
$ 1,986,436
|
Aug-04
|
Improvement of 9 (Nine) Intersections in Dhaka City, Dhaka, Bangladesh, Asphalt Overlay and footpathmedian development.
|
Roads & Highways Department
|
290,163,688
|
$ 5,090,591
|
Jul-04
|
Introduction of Circular Waterways around Dhaka City, 1st Phase: Improvement of Navigation and Providing Landing Facilities from Sadarghat to Ashulia Bridge. Work done by Basic Engineering - Basic Dredging JV.
|
BIWTA
|
16,400,000
|
$ 287,719
|
Jun-04
|
Maintenance Dredging in the Pussur River Channel of Mongla Port (2.8 million cubic meter)
|
Mongla Port Authority
|
415,126,000
|
$ 7,282,912
|
Feb-04
|
Dredging work of the Rivers Buriganga and Turag connection with the Project “Introduction of Circular Waterways around Dhaka City”
|
BIWTA
|
21,125,000
|
$ 370,614
|
Jan-04
|
Earth filling (land reclamation by dredging) at south side of the Burigonga River using IHC Beaver 3800NG dredger by Basic Engineering - Basic Dredging JV
|
AGE (Army) Postogola
|
150,514,000
|
$ 2,595,068
|
Dec-03
|
Design, supply and construction of 132 KV Double Circuit Overhead Line on Towers for Re-routing of existing 132KV Bheramara-Barisal Transmission Line to By-pass Barisal Airport and existing River Crossing Portion of
Turnkey basis (Contract No. 09384 dt. 05/03/2001)
|
Bangladesh Power Development Board
|
62,000,000
|
$ 1,068,965
|
Jun-03
|
Construction / Renovation of 132 kV Ashugonj – Mymensingh - Jamalpur Transmission Line
|
Power Grid Company of Bangladesh
|
5,203,112
|
$ 89,708
|
Mar-03
|
Renovation, Refurbishment and System improvement of departure floor of passenger terminal building of ZIA International Airport, Dhaka
|
Civil Aviation Authority of Bangladesh
|
123,428,728
|
$ 2,146,586
|
Jul-02
|
Improvement of Ground Clearance of Ashugonj-Jamapur 132 KV Double Circuit Transmission Line
|
Power Grid Company of Bangladesh
|
5,203,112
|
$ 90,488
|
Jul-02
|
Construction of Duct Bank, Manhole, Electrical Erection and Instrumentation work under Dhaka Grinding Plant Project (Scan Cement Industry) at Narayangonj
|
Korea Heavy Industries & Construction Co.(HANJUNG)
|
3,148,000
|
$ 60,538
|
May-01
|
Dhaka Grinding Plant Project, Tutki, Narayangonj
|
MELEC Engineering Co. Ltd.
|
10,425,000
|
$ 200,480
|
Feb-01
|
Construction/ Renovation of Ashugomj-Jamalpur 132 Kv Transmission Line (second circuit) under RRAGS (east) project
|
Bangladesh Power Development Board
|
8,837,417
|
$ 184,112
|
Dec-99
|
Construction and re-construction Coastal Embankment & Hydraulic Structures of Polder-59/2, Rangamati and Polder 73/1B, Hatiya, Contract:13
|
Bangladesh Water Development Board
|
370,340,454
|
$ 7,715,426
|
May-99
|
Construction of 132 Kv By-pass line at Barisal Airport
|
Bangladesh Power Development Board
|
2,992,805
|
$ 70,418
|
Sep-97
|
Construction of Related Structures of S3D, T1S 3D, T2S 3D, T3S3D, S3D, T1D, T2D, and T3D of Dinajpur canal under Teesta
Barrage Project during the financial year 1994-95 & 1995-96 in Group No. 24D (Part-B)
|
Bangladesh Water Development Board
|
43,124,561
|
$ 1,014,695
|
Jun-97
|
65 Ft (13 pcs) Panzermast H-Pole and SumiTomo, SumiTomo, Japan
|
Bangladesh Power Development Board
|
11,370,732
|
$ 267,546
|
Feb-97
|
Excavation & Construction of Dinajpur Canal of Teesta Barrage Project in Group No. DC-5
|
Bangladesh Water Development Board
|
8,996,520
|
$ 219,427
|
Dec-96
|
Kalni-Kushiyara Pilot Dredging Project
|
Northeast Regional Project
|
53,182,625
|
$ 1,297,137
|
Sep-96
|
Supply, installation &b Testing of 200 KVA Diesel Generator Set at LGED HQ
|
LGED
|
2,066,000
|
$ 50,390
|
Jun-96
|
Bridge Construction at Somsernogor Road, Moulovibazar
|
Roads & Highways Department, Moulovibazar
|
17,938,668
|
$ 444,026
|
Oct-95
|
Protective work with earth, Geo-textile & CC block at Tongi-Ashulia-Savar Road
|
Roads & Highways Department
|
5,548,130
|
$ 137,329
|
May-95
|
Flexible pavement construction at Naogaon-AtraiNatore Road
|
Roads & Highways Department, Naogaon
|
7,999,282
|
$ 197,513
|
Oct-94
|
Supply & gravel laying at Hasnabad and Haripur 230 Kv Sub-station
|
Bangladesh Power Development Board
|
225,000
|
$ 5,555
|
Jul-94
|
Land filling work at Dhaka EPZ under work order no.: BEPZA/ CE-11/ 93/ 2257
|
BEPZA
|
9,348,000
|
$ 230,814
|
May-94
|
Construction of Control Room Building Equipment & Transformer Foundation, Boundary Wall, Cable Trench, Gravel Paving & Road Paving work, Foundation, construction and erection work of 02 sets 230/132 KV, 225 MVA
Power Transformer work at Hasnabad and Haripur 230/132 Kv
|
Bangladesh Power Development Board
|
38,613,965
|
$ 953,431
|
Mar-94
|
Construction of Bhandaria 132/33 KV Sub-station and 132 KV Transmission line from Kacha River Crossing up to Bhandaria
|
Bangladesh Power Development Board
|
7,000,000
|
$ 172,839
|
Mar-94
|
Pavement construction at Sylhet-SalutikorKompanigonj Road
|
Roads & Highways Department, Sylhet
|
7,824,247
|
$ 193,191
|
Mar-94
|
Earth filling work at Haripur 230/132/33 KV Substation and construction of Embankment around the Sub-station
|
Bangladesh Power Development Board
|
25,355,322
|
$ 629,164
|
Dec-93
|
Hasnabad and Haripur 230/132 KV (Boundary wall, control building works, Foundation, additional wor ks) Sub-station
|
Lucky Engineering Co. Ltd.
|
38,613,965
|
$ 958,162
|
Dec-93
|
Sub-structure pilling work, pier work, pile cap at ODA Priority ‘B’ Bridges Contract 7, BhangaMawa Road
|
Roads & Highways Department
|
20,673,695
|
$ 512,994
|
Nov-93
|
Road Pavement work at Feni-Chittagong Highway
|
Concord-Pragatee Consortium Ltd.
|
25,070,500
|
$ 622,096
|
Nov-93
|
Earth filling by Dredger at Meghna Bridge Revetment Project
|
OBAYASHI CORPORATION
|
21,348,400
|
$ 529,736
|
Aug-93
|
Construction of 600 sft (10 unit) Residential Building
|
Bangladesh Power Development Board
|
3,500,000
|
$ 86,848
|
Jul-93
|
Reclamation of Camp yard by dredger for MeghnaGumti Bridge Construction Project
|
Obayashi Corporation
|
14,000,000
|
$ 347,394
|
Feb-93
|
Construction of 3-storey Residential building
|
Dird Private Ltd.
|
7,069,320
|
$ 176,733
|
Oct-92
|