EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Construction of 3-storey Residential
building |
Dird Private Ltd. |
7,069,320 |
$ 176,733 |
Oct-92 |
Reclamation of Camp yard by dredger
for Meghna- Gumti Bridge
Construction Project |
Obayashi Corporation |
14,000,000 |
$ 347,394 |
Feb-93 |
Construction of 600 sft (10
unit) Residential Building |
Bangladesh Power Development Board |
3,500,000 |
$ 86,848 |
Jul-93 |
Earth filling by Dredger at Meghna Bridge Revetment Project |
OBAYASHI CORPORATION |
21,348,400 |
$ 529,736 |
Aug-93 |
Road Pavement work
at Feni-Chittagong Highway |
Concord-Pragatee Consortium Ltd. |
25,070,500 |
$ 622,096 |
Nov-93 |
Sub-structure pilling work, pier work,
pile cap at ODA Priority ‘B’ Bridges Contract 7, BhangaMawa Road |
Roads & Highways Department |
20,673,695 |
$ 512,994 |
Nov-93 |
Hasnabad and Haripur 230/132 KV (Boundary wall, control
building works, Foundation, additional works) Sub-station |
Lucky Engineering Co. Ltd. |
38,613,965 |
$ 958,162 |
Dec-93 |
Earth filling work at Haripur 230/132/33 KV Sub- station and construction of
Embankment around the Sub-station |
Bangladesh Power Development Board |
25,355,322 |
$ 629,164 |
Dec-93 |
Pavement construction at Sylhet-Salutikor- Kompanigonj
Road |
Roads & Highways Department, Sylhet |
7,824,247 |
$ 193,191 |
Mar-94 |
Construction of Bhandaria 132/33 KV Sub-station and 132 KV
Transmission line from
Kacha River Crossing up to Bhandaria |
Bangladesh Power Development Board |
7,000,000 |
$ 172,839 |
Mar-94 |
Construction of Control Room
Building Equipment & Transformer Foundation, Boundary Wall, Cable Trench,
Gravel Paving & Road Paving work, Foundation, construction and erection
work of 02 sets 230/132 KV, 225 MVA Power Transformer work at Hasnabad and Haripur 230/132 Kv |
Bangladesh
Power Development Board |
38,613,965
|
$ 953,431
|
Mar-94
|
Land filling work at Dhaka EPZ under work
order no.: BEPZA/ CE-11/ 93/ 2257 |
BEPZA |
9,348,000 |
$ 230,814 |
May-94 |
Supply & gravel laying
at Hasnabad and Haripur 230 Kv Sub-station |
Bangladesh Power Development Board |
225,000
|
$ 5,555
|
Jul-94
|
Flexible pavement construction at Naogaon-Atrai- Natore
Road |
Roads & Highways Department, Naogaon |
7,999,282
|
$ 197,513
|
Oct-94
|
Protective work with earth,
Geo-textile & CC block at Tongi-Ashulia-Savar Road |
Roads & Highways Department |
5,548,130 |
$ 137,329 |
May-95 |
Bridge Construction at Somsernogor Road, Moulovibazar |
Roads & Highways Department, Moulovibazar |
17,938,668
|
$ 444,026
|
Oct-95
|
EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Supply, installation &b Testing
of 200 KVA Diesel Generator Set at LGED HQ |
LGED |
2,066,000 |
$ 50,390 |
Jun-96 |
Kalni-Kushiyara Pilot Dredging Project |
Northeast Regional Project |
53,182,625 |
$ 1,297,137 |
Sep-96 |
Excavation & Construction of Dinajpur Canal
of Teesta Barrage
Project in Group No. DC-5 |
Bangladesh Water Development Board |
8,996,520
|
$ 219,427
|
Dec-96
|
65 Ft (13 pcs)
Panzermast H-Pole and SumiTomo,
SumiTomo,
Japan |
Bangladesh Power Development Board |
11,370,732
|
$ 267,546
|
Feb-97
|
Construction of Related Structures of S3D, T1S 3D,
T2S 3D, T 3S3D, S 3D,
T 1D,
T 2D,
and T3D of
Dinajpur canal
under Teesta Barrage Project during
the financial year
1994-95 & 1995-96 in Group No. 24D
(Part-B) |
Bangladesh Water Development Board |
43,124,561
|
$1,014,695
|
Jun-97
|
Construction of 132 Kv By-pass
line at Barisal Airport |
Bangladesh Power Development Board |
2,992,805
|
$ 70,418
|
Sep-97
|
Construction and re-construction Coastal
Embankment & Hydraulic Structures of Polder-59/2, Rangamati and Polder 73/1B, Hatiya, Contract:13 |
Bangladesh Water Development Board |
370,340,454
|
$ 7,715,426
|
May-99
|
Construction/ Renovation of Ashugomj-Jamalpur 132 Kv
Transmission Line (second circuit) under RRAGS (east) project |
Bangladesh Power Development Board |
8,837,417
|
$ 184,112
|
Dec-99
|
Dhaka Grinding Plant Project, Tutki, Narayangonj |
MELEC
Engineering Co.
Ltd. |
10,425,000
|
$ 200,480
|
Feb-01
|
Construction of Duct Bank,
Manhole, Electrical
Erection and Instrumentation work under Dhaka Grinding Plant Project (Scan
Cement Industry) at Narayangonj |
Korea Heavy Industries & Construction Co. (HANJUNG) |
3,148,000
|
$ 60,538
|
May-01
|
Improvement of Ground Clearance of Ashugonj- Jamapur 132 KV Double
Circuit Transmission Line |
Power Grid Company of Bangladesh |
5,203,112
|
$ 90,488
|
Jul-02
|
Renovation, Refurbishment and System
improvement of departure floor
of passenger terminal building of ZIA International
Airport, Dhaka |
Civil Aviation Authority of Bangladesh |
123,428,728
|
$ 2,146,586
|
Jul-02
|
Construction / Renovation of
132 kV Ashugonj –
Mymensingh
- Jamalpur Transmission Line |
Power Grid Company of Bangladesh |
5,203,112
|
$ 89,708
|
Mar-03
|
EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Design, supply and construction of 132 KV Double
Circuit Overhead Line on Towers for
Re-routing of existing 132KV Bheramara-Barisal Transmission Line to By-pass Barisal Airport and existing River
Crossing Portion of Turnkey basis (Contract No.
09384 dt.
05/03/2001) |
Bangladesh
Power Development Board |
62,000,000
|
$1,068,965
|
Jun-03
|
Earth filling (land reclamation by
dredging) at south side of the Burigonga River
using IHC Beaver 3800NG dredger by Basic Engineering - Basic Dredging JV |
AGE (Army) Postogola |
150,514,000 |
$ 2,595,068 |
Dec-03 |
Dredging work of the Rivers Buriganga and
Turag connection with the Project “Introduction of Circular Waterways around Dhaka City” |
BIWTA
|
21,125,000
|
$ 370,614
|
Jan-04
|
Maintenance Dredging in the Pussur River Channel of Mongla
Port (2.8 million cubic meter) |
Mongla Port Authority |
415,126,000
|
$ 7,282,912 |
Feb-04 |
Introduction of Circular Waterways
around Dhaka City, 1st
Phase: Improvement of
Navigation and Providing Landing Facilities from Sadarghat to Ashulia Bridge.
Work done by Basic Engineering - Basic Dredging JV. |
BIWTA
|
16,400,000
|
$ 287,719
|
Jun-04
|
Improvement of 9 (Nine) Intersections in Dhaka
City, Dhaka, Bangladesh, Asphalt Overlay and
footpath- median development. |
Roads & Highways Department |
290,163,688
|
$ 5,090,591
|
Jul-04
|
Carrying out Bored cast-in-situ pilling work with
Rotary Rig at
Lafarge Surma Cement Plant
Project, Chatak, Sylhet |
Larsen & Toubro Limited, India |
113,226,897
|
$1,986,436
|
Aug-04
|
Construction of Foundation and
Erection of Microwave Tower and
related works, Magura,
Bangladesh, Cast- in-situ bored piling of dia600mm,
construction of foundation, erection of tower |
Pacific Bangladesh Telecom Ltd. |
31,070,946
|
$ 545,104
|
Oct-04
|
Piling work at Lafarge-Surma Cement Project, Sylhet, Bangladesh, Construction of cast-in situ
bored piling work with
Rotary Rig, 1200mm, 1000mm, 800mm and 600mmdia |
Larsen & Toubro Limited, India |
89,288,628
|
$ 1,566,467
|
Dec-04
|
Strengthening of
existing pavement of
Moulvibazar- Sreemongal, Sylhet during
the year 2003-2004, Contract No. 03 (Three)/2003-2004. SE/SRC, Sylhet,
Bangladesh |
Roads & Highways Department |
167,098,115 |
$ 2,906,054 |
Feb-05 |
Strengthening of existing pavement
of Moulvibazar- Srimongal-Shaistagonj-Teliapara-Jagadishpur
Road (With link to Sherpur) under Moulvibazar Road
Division of Sylhet Road Circle, Sylhet during the year
2003- 2004, Contract No.
02 (Two)/2003-2004. SE/SRC,
Sylhet, Bangladesh |
Roads & Highways Department |
196,130,796
|
$ 3,410,970
|
Mar-05
|
EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Construction of Barapukuria-Rangpur
132 KV Double Circuit Transmission Line |
HG Power Transmission SdnBhd, Malaysia |
30,564,000 |
$ 531,547 |
Mar-05 |
Periodic Maintenance Program
2003-PMP-2/2003- 2004, Package No. PMP 2003-2004/C49 under
Roads and Highways Department, Barisal, Bangladesh |
Roads & Highways Department |
22,643,855 |
$ 393,806 |
May-05 |
Electrical instrumentation and installation work at Lafarge-Surma Cement
Plant, Sylhet, Bangladesh |
Larsen & Toubro Limited, India |
2,505,403 |
$ 43,572 |
Aug-05 |
Construction of 3 nos. Bridge at Chhatak East Road,
Chhatak Gas Field, Sunamganj.
Sylhet,
Bangladesh |
Niko Resources (Bangladesh) Ltd. |
12,904,860 |
$ 224,432 |
Sep-05 |
Construction of Drilling Pad of Chattak Gas Field, Sunamganj, Sylhet, Bangladesh |
Niko Resources (Bangladesh) Ltd. |
18,700,000 |
$ 325,217 |
Sep-05 |
Land Development and Slope
Protection work at proposed Khulna 230/132 kV
Substation, Batiaghata, Khulna;
Contract No. 01/PGCB/ Sec/2004/2550, Khulna,
Bangladesh,
Land Development work |
Power Grid Company of Bangladesh Ltd. |
28,364,466 |
$ 493,295 |
Oct-05 |
Casing installation at Bibiyana North Pad Location, Sylhet, Bangladesh |
UNOCAL
Bangladesh Ltd. |
5,806,024 |
$ 100,974 |
Oct-05 |
Strengthening of existing pavement
of Sylhet-
Fenchuganj-RajnagarMoulvibazar-Srimongal- Shaistagonj-Teliapara-Jagadishpur Road
(With link to Sherpur) under Habiganj
Road Division of Sylhet Road Circle, Sylhet during the year 2004-2005, Contract
No. 01 (One)/2004-2005/SE/SRC, Sylhet, Bangladesh |
Roads & Highways Department |
107,045,047 |
$ 1,861,653 |
Nov-05 |
Construction of Foundation, piling
work and Erection of Generator
room, Shelter room, Guardroom, Boundary wall
etc. for Microwave Tower and
related works at Sitakunda&Wahedpur, Chittagong, Bangladesh. |
Orasinvest (BD) Ltd. |
10,384,369 |
$ 180,597 |
Nov-05 |
Casing Installation work at
Production Pad &
Relief Well of Chattak Gas Field, Sunamganj, Sylhet, Bangladesh |
Niko Resources (Bangladesh) Ltd. |
7,551,959 |
$ 131,338 |
Nov-05 |
Construction of drilling pad for the rig at Chattak East & earth
work layer by layer with
watering &
compaction by roller &vibrocompactor at Chattak East
road |
NIKO RESOURCES (BD) LIMITED |
48,850,000 |
$ 751,538 |
Jan-06 |
Improvement of 2 nos. LGED Bridge
at Enayetgonj Bazar |
Chevron Bangladesh |
12,792,000 |
$ 196,800 |
Jan-06 |
Strengthening of
2 (two) nos.
Bridges at Bibiyana Gas
Field, Sylhet, Bangladesh |
UNOCAL
Bangladesh Ltd. |
13,036,303 |
$ 200,558 |
Jan-06 |
Construction of 100 meter
Oxbow lake Bridge at Bibiyana Gas field,
Sylhet, Bangladesh |
UNOCAL
Bangladesh Ltd. |
45,000,000 |
$ 692,307 |
Jul-06 |
Emergency Flood Damage
Rehabilitation Project, Contact no.: EFDRP/SZ/HBG/Z-01 |
Roads & Highways Department |
16,920,436 |
$ 260,314 |
Sep-06 |
EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Installation of Test Pilling Work
at Jattrabari-
GulistanFlyover.Dhaka, Bangladesh |
Dhaka City Corporation |
20,000,000 |
$ 307,692 |
Oct-06 |
PMP 2005-06/C048 (Bituminous
Carpeting work) at Rupsha , khulna&Terokhada, Mollahar |
Roads & Highways Department |
15,904,220 |
$ 244,680 |
Dec-06 |
Road Maintenance and Improvement Project, Dhaka- Chittagong Road, Bangladesh, Milling and cold-in situ Re-cycling and overlay works,
(Total 41.38
km) executed by NAZIR-BASIC JV |
Roads & Highways Department |
529,058,945 |
$ 8,397,761 |
Jun-07 |
Carrying out Cast-in situ piling
(Marine) at Dapdapia
Bridge, Barisal |
MBEC-PBL-COPRI JOINT VENTURE |
42,740,894 |
$ 623,954 |
Oct-08 |
Design-build and turnkey construction of 132 kV Double Circuit Aminbazar-Savar
Transmission Line, length of line 25km,
nos. of tower, 80 nos. |
Power Grid Company of Bangladesh |
131,683,509 |
$ 1,908,456 |
Jul-09 |
Periodic Road maintenance of
Kurigram-Ulipur-
Chilmari Road, Contract # PRMC-RZ-7 |
Roads and Highways Department |
58,368,388 |
$ 845,918 |
Dec-09 |
Periodic Road Maintenance Component Contract # 4 for Periodic Maintenance of i) Barobari-Burimary, National Road (N509) 104,630 km under
Road Network Improvement & Maintenance Project-I (RNIMP-I) |
Roads and Highways Department |
163,683,235
|
$ 2,358,548
|
Aug-10
|
Bibiyana South Pad Dyke Repair Construction, Contract # 812590 |
Chevron Bangladesh Block Twelve, Ltd. |
110,286,871 |
$ 1,477,386 |
Jul-11 |
Bibiyana Expansion Project - PABC (accomodation block),
Sylhet,
Bangladesh |
Chevron Bangladesh |
114,948,751 |
$ 1,478,440 |
Dec-13 |
Foundation construction, Erection &
Stringing of Nine
(9) towers for 230 kV Transmission line across Tetulia River (5.5
km) in Barisal under
PGCB |
KEC International, India |
767,433,116 |
$ 9,864,178 |
Feb-15 |
Supply Heavy Equipments for lifting
& handling Construction Project |
Plexal Group, Thailand |
28,000,000 |
$ 359,897 |
Feb-15 |
Design, Supply, Iinstallation,
Testing and Commissioning of 132
kV Overhead Transmission
Line under “Energy Efficiency Program-II, DPDC, Bangladesh |
LTB Leitungsbau GmbH, Germany |
228,100,000 |
$ 2,815,286 |
Apr-15 |
Bibiyana Expansion Project, Main Civil Works, Sylhet,
Bangladesh.
(Cable trenching works, Duct Bank, CPVC Pipe
works, HDPE pipe works ) |
Chevron Bangladesh |
717,770,860 |
$ 8,972,135 |
May-15 |
Strengthening of
existing jetty at
Mongla cement
factory, Mongla,
Bagerhat |
Sena Kallyan Sangstha,
under Bangladesh
Army |
107,025,000 |
$ 1,374,233 |
Aug-15 |
EXECUTED PROJECTS BY BASIC ENGINEERING LIMITED IN BANGLADESH
|
CLIENT
|
CONTRACT VALUE (BDT)
|
EQUIVALENT VALUE IN USD
(Approx.)
|
COMPLETION DATE
|
Water intake construction, sheet
piling works, dewatering system & associated works at Ashuganj
Power Plant water intake project, Ashuganj, Bangladesh |
TSK company (Spain) |
75,962,157 |
$ 949,527 |
Dec-15 |
Stringing & other associated
activities in 132kV Comilla (N) to Comilla (S) T/L under Tripura (India)-Comilla (South) Substation (Bangladesh) Grid Interconnection
Project |
KEC
International, India |
7,920,000 |
$ 99,000 |
Jan-16 |
Dismantling the 132kV existing line
and Fabrication, Erection, Testing and Commissioning of 132 KV double circuit line under
Summit Barisal 110 MW Power Plant |
Summit Power, Bangladesh |
4,000,000 |
$ 50,000 |
Jan-16 |
MPA Vessel Berth Jetty
Renovation Works including installation of Fender System
at Mongla, Bagerhat |
Navana CNG Limited (LPG Unit) |
60,124,181 |
$ 733,222 |
Apr-17 |
Stringing of Phase Conductors (Twin Bundle)
including OPGW &
Earthwire
on the line,
Length-42 Rt-km under Ashugonj-Bhulta
D/C 400kV transmission Line |
KEC
International, India |
29,261,400 |
$ 356,846 |
Jun-17 |
Installation Works including Site
Survey & Drawing, Design of Tower Foundation Testing & Commissioning
of Chakaria-Matarbari 132kV Single Circuit
Transmission Line on Double
Circuit Tower |
Angelique International Ltd, India |
108,469,400 |
$ 1,322,798 |
Mar-18 |
Construction, Erection, Testing & Commissioning of 132kV Double
Circuit Power Evacuation Line for Summit Gazipur 149 MW Power Generation Project, Kodda, Gazipur |
Ace Alliance Power Limited |
32,199,391 |
$ 392,676 |
Apr-18 |
Construction of Civil Foundation, Erection, Testing
and Commissioning of 230kV Double
Circuit Power Evacuation Line
for Summit Gazipur II 300 MW power plant Project, Kodda, Gazipur |
Summit Gazipur II Power Limited |
72,593,411 |
$ 885,286 |
Apr-18 |
Installation of Fixed Platform at Barabkunda, Sitakunda |
BM
Energy (BD) Ltd |
115,000,000 |
$ 1,402,439 |
Mar-19 |
Installation of 1000mm dia Raker &
Vertical pile with Permanent Full Steel Casing
Fix Dolphin Jetty at Karnaphully River, Chittagong |
Soya Products Bangladesh Ltd, a subsidiary of United Group |
36,500,000 |
$ 1,402,439 |
Mar-19 |
Supply of Fender, Mooring Bollard
and Frontal System for LPG satellite plant
at Kolinga, Rupganj, Narayanganj |
Petromax LPG |
10,200,000 |
$ 124,390 |
Apr-19 |